Bellevue, Washington

We are hiring people who like finishing things

Renovation work is harder than new build. Nothing is square, everything is concealed until it is not, and the client is often standing in the room. If that sounds like your kind of week, read on.

A construction worker using a power drill on a building site, outdoors during the day.

What we offer

Four things that are not on most job ads

  • Four-day framing weeks

    Monday to Thursday on site, Friday for training, shop work or a long weekend. It has cut our turnover more than any pay rise did.

  • Tools and boots allowance

    An annual allowance, plus all consumables and every piece of PPE supplied rather than deducted.

  • Paid apprenticeship hours

    Structured progression through demolition, framing, structural install and finish, with paid time toward a journeyman card.

  • One job at a time

    You are not driving between three sites. You finish a house and then you start another one.

Open roles

Four positions, all full time

  • Lead carpenter

    Full time

    $38 to $52 per hour (sample)

    Running a whole-home job from demolition through punch, with a crew of two to four. Framing, structural install and finish carpentry. Reading a stamped structural set is essential.

    Apply by email
  • Finish carpenter

    Full time

    $34 to $46 per hour (sample)

    Doors, casing, base, built-ins and stair parts on renovation work where nothing is square. Scribing is a daily skill here, not an occasional one.

    Apply by email
  • Project coordinator

    Full time

    $72,000 to $94,000 (sample)

    Owning the submittal register, the lead-time tracker and the inspection calendar across four concurrent projects. Chasing a window supplier is a core part of the role.

    Apply by email
  • Apprentice carpenter

    Full time, 4-year path

    $24 to $32 per hour (sample)

    Structured progression through demolition, framing, structural install and finish, with paid time toward a journeyman card.

    Apply by email
Material samples laid out in the design studio

Next step

Not looking for work, looking for a renovation?

The walk-through is the same either way: ninety minutes, crawlspace first, budget band after.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.