Money and milestones

Four routes to paying for it, and how we bill

We do not lend and we take no referral fee from anyone who does. What we can do is structure the draw schedule so your lender's inspections and the jurisdiction's land on the same day.

Architecture scheme of floor on paper placed on wooden surface near pen and ruler in room during renovation work in building

Four common routes

None of these is universally best. Each suits a different combination of equity, timeline and appetite for rate risk. All figures on this page are sample content.

  • 01

    Renovation mortgage

    Best for: Buying a house that needs work

    The purchase and the renovation are financed together against the after-renovation value. Draws are released against lender inspections, which we schedule alongside jurisdiction inspections so one site visit serves both.

    Requires a lender-approved contractor and a fixed-price contract before closing.

  • 02

    Home equity line

    Best for: Owners with equity and a phased plan

    Flexible and quick to draw, which suits phased work. Interest is usually variable, so a long schedule carries rate risk you should model before committing to a full whole-home scope.

    Rates and terms vary by lender. Sample figures only.

  • 03

    Cash-out refinance

    Best for: Large single-phase renovations

    One fixed rate over one long term. It makes sense when the renovation is large enough to justify resetting the mortgage, and when the current rate is not dramatically below market.

    Closing costs apply. Compare against the rate on your existing loan.

  • 04

    Phased self-funding

    Best for: Owners who want to avoid debt

    We design the full scope, permit what has to be permitted together, and build in three phases across two to four years. Rough-in is stubbed for later phases so nothing finished has to be reopened.

    Material prices move between phases. We revalidate pricing at each phase start.

Our draw schedule

Six billings, each tied to something verifiable

Every draw is tied to an event a third party confirms: a permit issued, an inspection passed, a delivery received. None of them is tied to a date on a calendar.

  1. 10%

    Deposit

    On contract signature. Covers mobilisation, permit fees and the first long-lead deposits.

  2. 15%

    Permit issue

    Released when the permit is in hand. Cabinetry, windows and any utility coordination go on order the same week.

  3. 25%

    Rough-in complete

    After plumbing, electrical and mechanical rough inspections pass.

  4. 20%

    Drywall complete

    After the drywall nail inspection and finishing.

  5. 20%

    Finishes underway

    Cabinetry set, stone templated, flooring down and protected.

  6. 10%

    Final inspection and punch

    Released when the final inspection passes and the punch list is closed.

Sample percentages for this demo site. The real split is set in your contract and will reflect the scope.

If the budget will not carry everything

Phase it in this order, not in room order

  1. Phase one · 45 to 55 percent of the total

    Everything behind the walls

    Structure, roof, windows, electrical service, mechanical and plumbing distribution. None of it shows, all of it is impossible to add later without opening finished walls.

  2. Phase two · 30 to 35 percent

    The rooms you live in daily

    Main-floor finishes, the primary bathroom, flooring across the level and the room where the household actually gathers.

  3. Phase three · 15 to 25 percent

    The rooms that can wait

    Basement fit-out, secondary bathrooms, the deck and landscaping. All of it can be built later without disturbing phase one or two, as long as the rough-in was stubbed for it.

Lead times and the full phasing plan

Answers

Money questions

Not answered here?Ask us directly

No. We are builders, not a lender or a broker, and we do not take a referral fee from one. We will work with whoever you choose and align the draw schedule to their inspection milestones.

Yes, and we prefer it. We schedule the lender's inspection alongside the jurisdiction's so one site visit serves both and the draw is not held up waiting for a second appointment.

Ten percent of the contract on signature, which is within Washington's limits for residential work. Sample figure for this demo.

Often yes. The sequence matters more than the split: everything behind the walls goes first, and rough-in for later phases is stubbed during phase one so nothing finished is reopened.

Material samples laid out in the design studio

Next step

Start with a walk-through, not a price

Ninety minutes in your house. We look at the crawlspace, the attic and the panel before we look at the kitchen, and you leave with a budget band you can plan around.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.