Bellevue, Washington · design-build since 2009

Whole houses, drawn and built by one practice.

Additions, basements, main-floor reworks, floors, paint and the two rooms everyone else specialises in. One contract, one superintendent, one set of drawings that agrees with itself.

  • Architect on staff
  • Fixed price against drawings
  • Lead-safe certified
A renovated main living space after a whole-home renovation
West Bellevue, 1962 rambler taken back to the studs. 22 ft clear span.

Since 2009 (sample figures)

  • 214Renovations completed
  • 1,180Inspections passed
  • 9Scopes under one contract

Typical permit review

Same-footprint room
1 to 2 weeks
Bearing wall removal
6 to 12 weeks
Addition
10 to 20 weeks
Permit path by work type
  • WA contractor registrationATELNW*123LM, bonded and insured (sample).
  • Lead-safe certified firmRequired on every house built before 1978.
  • Architect on staffDrawings produced in-house, not outsourced at permit.
  • One superintendent per jobNever split across three sites at once.
  • Stamped engineeringEvery structural change reviewed by a licensed engineer.
  • Written change ordersPriced, signed and scheduled before any work starts.
Load pathsShear wallsLVL and PSLPad footingsEgress openingsMake-up airManual JVapour controlFlood-tested pansLead-safe practiceTruss modification lettersChange orders in writing

Niche substance · permits

Which inspections you get, and in what order

Pick the work you are planning. The permits, the review window and every inspection appear in the sequence an inspector will actually want them.

Cosmetic refresh

Paint, flooring, trim and like-for-like fixtures.

Permits required
  • No building permit required
  • No sub-permits where nothing is relocated
Review window
None. Work can start the week the contract is signed.
Typical fees
$0 in permit fees (sample). Budget instead for lead-safe containment on pre-1978 houses.

Replacing a light fixture is fine. Adding a circuit, moving a switch or touching the panel is electrical work and needs its own permit, even in a job that otherwise needs none.

  1. None by the jurisdiction

    n/a

    Nobody from the city visits. Quality control is entirely ours: a defined drywall finish level, a documented sheen schedule and a punch walk with you at the end.

  2. Our internal raking-light check

    After the first coat

    We put a work light flat against each wall before the second coat. Anything that shows gets patched, sanded and re-primed before we carry on.

The full permit and inspection guide

Niche substance · lead times

Order it before you need it

Three items hold up more renovations than every other cause combined: custom cabinetry, clad wood windows and utility coordination for a service upgrade. All three are ordered the week the permit is issued.

Weeks are from order release to delivery, for the Seattle market. They are sample figures and they move.

The full lead-time register
  1. CabinetryLow risk

    Stock cabinetry

    Lead time
    3 to 5 weeks
    Order by
    At permit issue

    Available in fixed sizes. Filler strips do the fitting.

  2. CabinetryMedium risk

    Semi-custom cabinetry

    Lead time
    8 to 12 weeks
    Order by
    At permit issue

    Sizes to the inch, limited door and finish range.

  3. CabinetryHigh risk

    Full custom millwork

    Lead time
    14 to 22 weeks
    Order by
    Before permit submission

    The single most common cause of a delayed finish date. Shop drawings must be approved against framed dimensions.

  4. Windows and doorsLow risk

    Stock vinyl windows

    Lead time
    4 to 6 weeks
    Order by
    Before framing starts

    Fine for secondary elevations and basements.

  5. Windows and doorsHigh risk

    Clad wood windows

    Lead time
    10 to 16 weeks
    Order by
    At permit issue

    Framing cannot be closed until these are in and installed.

  6. Windows and doorsHigh risk

    Exterior doors, custom

    Lead time
    12 to 20 weeks
    Order by
    Before permit submission

    Rough opening depends on the actual unit, so the order drives the framing.

  7. Windows and doorsLow risk

    Interior doors, stock

    Lead time
    2 to 4 weeks
    Order by
    Before drywall
  8. AppliancesLow risk

    Mainstream appliance package

    Lead time
    2 to 6 weeks
    Order by
    Before cabinet fabrication

    Specs are needed early even if delivery is late, because cabinetry is built to them.

West Bellevue, 2025

A 1962 rambler, before and after the structure changed

Drag the handle. The finishes are the part you notice; the beam, the footings and the panel are the part that cost the money.

The renovated main living space after work
The same room before the renovation
  1. 01

    Two bearing walls, one beam

    A 22 ft W12x40 steel beam replaced the walls between kitchen, dining and living. Flush framed, so the ceiling plane is continuous.

  2. 02

    The load path you cannot see

    PSL posts at both ends, blocked through the floor system, landing on two new 36 in pad footings poured in the crawlspace.

  3. 03

    Mechanical done at the same time

    The 1962 furnace and its 1990s duct extension came out together. A ducted heat pump and a 200-amp panel replaced them.

  4. 04

    One floor, forty-two feet

    White oak runs from the entry to the rear slider with no transition. Three days of levelling compound made that possible.

Open the case study

Niche substance · structure

Structural or cosmetic? It decides the whole budget

Finishes are the visible money. Load paths are the real money. Work out which tier your project sits in before you price a single tile.

Cosmetic

No engineer

Finishes change, nothing that holds the house up is touched. Floors, paint, trim, fixtures replaced in place, cabinetry in the same footprint.

Cost impact
Baseline
Schedule impact
Baseline

How you can tell

  • No wall is being removed or moved
  • No opening is being widened
  • Nothing is being added above an existing floor
  • Plumbing and electrical stay where they are

What it triggers

  • No structural review
  • No stamped drawings
  • No framing inspection
  • Often no permit at all

The full structural scope guide

Niche substance · living through it

Staying in the house, phase by phase

About half our clients stay put. It is usually cheaper than renting and always harder than expected. Here is what goes offline, when the dust peaks, and what we put in place before demolition starts.

The full survival plan
Dust containment sheeting inside a house under renovation
Week 0

Containment and setup

Low dustLight

Offline: One parking space on the drive, for the duration. The room that becomes the temporary kitchen.

Zip walls with self-closing zippers go up at every boundary between the work zone and the rest of the house, and the HVAC returns inside the zone get sealed so dust does not ride the ducts into your bedroom.

You decide: Where the temporary kitchen lives, where the dumpster sits, and which door the crew uses.

Weeks 1 to 2

Demolition

Peak dustLoud

Offline: Water to the work zone, intermittently. Any bathroom inside the zone, permanently from day one. Heating to the zone.

This is the loudest and dustiest fortnight of the project, and it is also the shortest. Plan to be out of the house during the day if anyone works from home or naps.

You decide: Nothing new. This is the one phase where the decisions are already behind you.

Weeks 3 to 5

Structural and shoring

High dustLoud in bursts

Offline: The route past the shored area. Power circuits serving the zone, on named days.

Temporary shoring walls appear on both sides of any wall we are removing. They are not decorative and they will be in the way. We will show you the path around them.

You decide: Whether any beam is flush or dropped. It has to be settled before the framing is closed.

Weeks 6 to 10

Rough-in and inspections

Moderate dustModerate

Offline: Hot water for a day during the water heater tie-in. Gas for a day during the pressure test. The second bathroom, once the first is finished.

Three trades work in sequence and then three inspectors visit, sometimes on the same morning. This is the phase where the schedule is most sensitive to the jurisdiction's inspection queue, not to our crew.

You decide: Final locations for switches, outlets, sconces and shower valves. Walk the rough-in with us before drywall.

Weeks 11 to 14

Insulation, drywall and sanding

Peak dustLow

Offline: Nothing, but the zone is sealed tight.

Drywall sanding is the second dust peak and the finer of the two. The containment stays up and the negative air machine runs continuously, including overnight.

You decide: Paint colours, confirmed against large on-site samples in both morning and evening light.

Weeks 15 to 21

Finish trades

Low dustLow to moderate

Offline: Rooms are handed back one at a time as they complete.

The house starts to feel like a house again. Trim, paint, cabinetry, stone, tile, flooring and lighting overlap, so there are often four trades on site at once.

You decide: Hardware, light bulb colour temperature, and where the touch-up cans will live.

Weeks 22 to 23

Punch and closeout

Low dustQuiet

Offline: Nothing.

Final inspections happen first. Then we walk the whole job with you and write the punch list together, in one document, with a date against each item.

You decide: Nothing. Put the furniture back.

A carpenter working inside an occupied house
One superintendent, on site every day the crew is.

Occupied job?

Tell us who is home and when

The consultation brief asks about pets, home working, school runs and which bathroom has to stay live.

Book a consultation

Niche substance · contracts

An allowance of $18,000, spent two ways

An allowance is not a discount and it is not a guess. It is a named placeholder with a stated scope, and the arithmetic when it moves should be visible before you sign anything.

What this allowance covers

The contract carries 1,100 square feet of tile across three bathrooms, a mudroom and a laundry. That figure already includes 12 percent waste for cuts and pattern.

The allowance is for delivered material only. Setting material, waterproofing membrane, trim and bullnose pieces, and all labour are fixed-price lines elsewhere in the contract, so they do not move when your selection moves.

At $18,000 for 1,100 square feet, the allowance buys material at $16.36 per square foot.

Inside the allowance

  • Field tile, delivered to the site
  • 12 percent waste already counted
  • Sales tax on the material

Fixed price elsewhere

  • Setting material, membrane and grout (fixed price)
  • Trim, bullnose, schluter and transition profiles (fixed price)
  • Tile setting labour (fixed price)
  • Any change in labour rate caused by a harder material or a larger format (priced as a change order)
Selection
Porcelain, 12 x 24 in, rectified
Rate
$11.80 / sq ft
Material total
$12,980
Against the allowance
-$5,020

Labour effect: No change. Same format, same setting time.

A credit of $5,020 appears on the next progress billing. Allowance credits are returned in full. We do not keep the difference.

Allowances, fixed price and the change-order ladder

4.9 average from 128 reviews (sample)

What clients say once the dust has actually settled

Every review below is sample content for this demo. The themes are the ones we hear most: honesty about structure, and communication during the months in between.

4.9 out of 5

  • 5 star91%
  • 4 star7%
  • 3 star2%
  • 2 star0%
  • 1 star0%
  • 4.9Google74 reviews
  • 4.9Houzz38 reviews
  • 4.8Angi16 reviews
Read all reviews

They documented two unpermitted alterations during the survey and priced the correction before we signed. No surprises in month four.

Marianne OkaforWest Bellevue · Whole-home renovation · 2025

Fourteen months in the house with two kids. The containment and the temporary kitchen made it survivable.

Devon AshworthNewport Hills · Home addition · 2025

I argued about paying for a flush beam instead of a dropped one. Standing in the room now, it was the right call.

Priya RaghunathanSomerset · Main-floor rework · 2024

They showed the shear re-sheathing as its own line in the estimate. It never felt like a change order.

Tomas LindqvistNorkirk, Kirkland · Second-storey addition · 2024

They tested the slab humidity before quoting the floor. Two other bidders did not.

Alina PetrescuTrossachs, Sammamish · Basement finishing · 2025

We asked for a kitchen. They told us the foundation came first. That honesty cost them four months of billing.

Gareth AmadiFirst Hill, Mercer Island · Whole-home renovation · 2024

Three contractors offered to cut our roof trusses. Atelier found the original manufacturer instead.

Hana YoshidaEducation Hill, Redmond · Main-floor rework · 2025

Lead-safe work on a 1928 house, done properly, with the cleaning verification documented each time.

Rosalind BekeleOlde Town, Issaquah · Whole-home renovation · 2024

The egress window took longer than anyone hoped. Communication about it was excellent, which is not the same as fast.

Ellis MarchettiWoodridge, Bellevue · Basement finishing · 2025

Book the walk-through

Ninety minutes, in your house, with the person who will draw it

Two questions here, three on the next step. You will hear back within one working day with two proposed times.

Step 1 of 2

Scope and timing
What is the project, roughly?
When suits for the walk-through?
Your details

Please enter your name.

Please enter an email we can reply to.

Please enter a phone number.

Please tell us which city.

Demo form. Nothing is sent and no data leaves this page.

Request received

Ingrid or Marcus will reply within one working day with two proposed times. Before the visit we will send a short list of what to have to hand: the county record card if you have it, any old permits, and the location of the crawlspace hatch.

  • Walk-through lasts about ninety minutes
  • You leave with a budget band, not a price
  • No design fee is charged for the first visit

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.